Cisco Systems AIRCAP3602IAK9 Router User Manual


 
3-41
Cisco 3600 Series Routers Hardware Installation Guide
OL-2056-05
Chapter 3 Installing the Router
Connecting WAN, LAN, and Voice Cables
Step 2 If all of the cables are routed through the cutout at the left, leave the small panels in place on the chassis
shield. If cables are routed through the openings in the chassis shield, remove the small panels as
required to provide openings for the cables. (See Figure 3-54.)
Note If you are going to route cables through the upper openings in the chassis shield, you must
remove the lower panels to permit chassis shield installation.
Figure 3-54 Removing Panels from Chassis Shield
Step 3
Hold the chassis shield at a 45-degree angle to the chassis, and attach it to the hinges at the right side.
Step 4 Position the cables to allow closing of the chassis shield, and close the chassis shield.
Note If cables are routed through the openings in the chassis shield, cables on the left side must exit
through the left openings, and cables on the right side must exit through the right openings.
Step 5 Tighten the two captive screws at the left side of the shield.
Step 6 Reinstall the panels over any openings that are not used for cables.
Step 7 Route the cables to the left side of the router, and organize the cables in bundles (see Figure 3-55 and
Figure 3-56):
Position the cables carefully, so that they do not put strain on the connectors.
Organize cables in bundles such that cables do not intertwine.
Step 8 Inspect the cables to make sure that the routing and bend radiuses are satisfactory. Reposition cables, if
necessary.
Step 9 Install cable ties in accordance with site requirements.
24225