Emerson Process Management BINOS 100 Welding Consumables User Manual


 
HOUSING
23 - 4
ETC00781(4) Series 100 e 02/2004
b) Front Panel
P Opening housing cover (Item 23.2.2 a).
P Unscrew the 6 fastening screws at both housing sides (Fig. 23-2)
P Remove front panel to the front carefully.
If the optional components fine dust filter and flow meter are mounted at front
panel - take care of gas lines (see Fig. 1-2) !
Closing the housing is performed in reverse order..
Do not squeeze gas lines !
OPENING THE HOUSING (BINOS
®
100 2M)
Fig. 23-2: BINOS
®
100 2M
(Fastening screws front panel, viewed without options filter and flow sensor)
Fastening screws,
front panel