Emerson Process Management BINOS 100 Welding Consumables User Manual


 
CONTENTS
VII
ETC00781(4) Series 100 e 02/2004
24.6.2 Sealed Photometer (Option) 24 - 8
25. CHECKING / REPLACING AN ELECTROCHEMICAL
OXYGEN SENSOR 25 - 1
25.1 Checking the Sensor 25 - 2
25.2 Replacing the Sensor 25 - 3
25.2.1 Remove the old Sensor 25 - 3
a) Oxygen Measurement without IR - channel 25 - 3
b) IR / Oxygen Measurement combined 25 - 5
25.2.2 Removing the Sensor 25 - 6
25.2.3 Reinstalling the Sensor 25 - 6
a) Oxygen Measurement without IR - channel 25 - 6
b) Combined IR / Oxygen Measurement 25 - 6
25.2.4 Basic settings for the Oxygen Sensor 25 - 7
27. TECHNICAL DATA 27 - 1
27.1 Options 27 - 1
27.2 Housing 27 - 1
27.3 Signal Inputs / Outputs, Interfaces 27 - 2
27.4 General Specifications 27 - 3
27.5 Voltage Supply 27 - 9
27.5.1 Electrical Safety 27 - 9
27.5.2 Power Supplies [UPS 01 T / SL10 / SL5] 27 - 9
28. REPLACING THE EPROM 28 - 1
30. CABLES AND CORDS 30 - 1
30.1 24 V DC Supply Cable 30 - 1
30.2 230/120 V AC Input (BINOS® 100 2M, UPS power supply) 30 - 2
30.3 Power Supply for Wall Mounted Analyzers (BINOS® 100 F) 30 - 2
30.3 Data / Signal Lines 30 - 3
30.3.1 Sub D Sockets, 9 pin 30 - 3
30.3.2 Sub D Plugs, 9 pin 30 - 3
32. FAILURE CHECK LIST 32 - 1
a) Customer Service 32 - 4
b) Training 32 - 4