-26-
Model G0757Z (Mfd. Since 02/15)
Horizontal Spindle Break-In
1. Run horizontal spindle at 72 RPM for 10
minutes (see Page 35 for details on how to
change speeds).
2. Reverse spindle rotation direction and run
spindle for an additional 10 minutes.
3. Run spindle for 5 minutes in each direction
of spindle rotation. Run following speeds:
210, 550 and 1300 RPM. Make sure to only
increase speeds in the order shown.
Congratulations! Spindle Break-In is complete.
We recommend changing the headstock oil
before operating the machine further (refer to
Lubrication on Page 46.
Since the head has been moved around for
shipping purposes, you will need to tram it
so that the spindle is perpendicular to the
table. Refer to the Tramming Spindle sec-
tion on Page 58 for detailed instructions.
Inspections &
Adjustments
The following list of adjustments were performed
at the factory before the machine was shipped:
• X-Axis Leadscrew Backlash ........... Page 60
• Gib Adjustments ..............................Page 61
Be aware that machine components can shift
during the shipping process. Pay careful atten-
tion to these adjustments during operation of the
machine. If you find that the adjustments are not
set according to the procedures in this manual or
your personal preferences, re-adjust them.
During the first 16 hours of use, the V-belts
will stretch and seat into the pulley grooves.
The V-belts must be properly tensioned
after this period to ensure proper power
transmission and avoid reducing the life of
the belts. Refer to V-Belt Service on Page 52
for detailed instructions.