3 Installation
MITSUBISHI CNC
68
3.3.2 Keyboard Unit
Mount the keyboard unit with four fixing screws.
(Note 1) Refer to "General Specifications: Keyboard Unit" for the panel cut dimension drawing and the screw hole
position.
(Note 2) A clear protective film covers the sheet keys of the keyboard at the time of shipment. Make sure to remove the
sheet before use.
3.3.3 Operation Panel I/O Unit
Mount the operation panel I/O unit on the back of the keyboard unit with four fixing screws.
(Note) The operation panel I/O unit is usually mounted on the keyboard unit when shipped.
Fixing screws (4)
NCKB
Connector
Fixing screw (4 pcs.)
M3x25
(with plain washer and spring washer)