OPERATION/CONTROL
44
Preparation
•
Start signal ...................................Switch, relay, etc. (for 1)
•
Frequency setting signal ..............0 to 5V, 0 to 10V or 4 to 20mA DC signals from a potentiometer or outside
the inverter (for 2)
•
Operation unit...............................Operation panel (FR-DU04), parameter unit (FR-PU04)
•
Connection cable .........................To be prepared for use of the operation unit away from the inverter
FR-CB2 (option) or the following connector and cable available on the
market:
•
Connector: RJ45 connector
•
Cable : Cable conforming to EIA568 (e.g. 10BASE-T cable)
3) Combined operation mode
Change the setting of Pr. 79 "operation mode selection" as follows:
Description
Setting
Running frequency setting Start signal
3
PU (FR-DU04/FR-PU04)
•
Direct setting and
key setting,
Multi-speed setting
Terminal signal
•
STF
•
STR
4
Terminal signal
•
0 to 5VDC across 2-5
•
0 to 10VDC across 2-5
•
4 to 20mADC across 4-5
•
Multi-speed selection (Pr. 4 to Pr. 6, Pr. 24
to Pr. 27)
•
Jog frequency (Pr. 15)
Parameter unit
•
FWD
key
•
REV
key
(
4
)
Communication operation mode
Communication operation can be performed by connecting a personal computer and the PU connector with
the RS-485 communication cable.
The inverter setup software (FR-SW0-SETUP-WE (or –WJ for Japanese Version)) is available as a startup
support software package for the FR-F500.
Preparation
•
Connection cable .........................Connector : RJ45 connector
Cable : Cable conforming to EIA568
(E.g. 10BASE-T cable)
•
Personal computer.......................Windows 95 or Windows 98 environment
(CD-ROM installation disk)
3