OPERATION/CONTROL
45
3.1.2 Power on
Before switching power on, check the following:
•
••
• Installation check
Make sure that the inverter is installed correctly in a proper location. (Refer to page 7.)
•
Wiring check
Make sure that the main and control circuits are wired correctly.
Make sure that the options and peripheral devices are selected and connected correctly.
(Refer to page 9.)
•
••
• Switch power on.
Power-on is complete when the POWER lamp is lit correctly and the operation panel (FR-DU04) displays
correct data.