A SERVICE OF

logo

Getting Started 5
E-EQ-MX3RG-J-ARC MX3 Reference Guide
Getting Started
Note: When your MX3 is pre-configured, the radio, PCMCIA card and endcaps are assembled
by LXE to your specifications. You may only need to install a storage/charging cradle or
handstrap.
This section’s instructions are based on the assumption that your new system is pre-configured
and requires only accessory installation (e.g. handstrap or cradle) and a power source.
LXE recommends that installation or removal of accessories be performed on a clean, well-lit
surface. When necessary, protect the work surface, MX3, and components from electrostatic
discharge.
In general, the sequence of events is:
1. Insert fully charged battery.
2. Install accessories.
3. Power the MX3 on.
4. Configure the software.
Note: New batteries must be fully charged prior to use. This process takes up to four hours in
an LXE Multi-Charger or LXE Multi-Charger Plus and up to eight hours using the MX3
internal charger.
Refer to the documentation received with the charger for complete information.
Refer to the “Integrated Scanner Programming Guide” to set up the SE923
scanner using barcodes.
Note: At this time you should create a DOS boot SRAM card for the MX3. The bootup card can
be used when the MX3 has corrupt or missing operating system files. Please refer to a
commercially available DOS user manual for boot disk instruction.