Reminder Checklist
Purchase of System
Have you ...
1. determined your load power and runtime requirements?
2. purchased redundant power and battery module if desired?
3. evaluated and selected a service plan?
Refer to
http://www.apc.com/products/symmetra_rm for answers to these and
other questions.
Site Preparation
Have you ...
1. determined where to install your UPS and ensured that enough rack space is available?
2. verified that the floor can support the total weight of a fully loaded system?
3. ensured that the site meets minimum environmental requirements, including HVAC?
Answers to these and other installation questions are found in the following sections.
Electrical Preparation
Have you ...
1. verified that the required input voltage is available?
2. scheduled an electrician for connecting the branch circuit (mains) or to hardwire the system?
3. determined all output-wiring configurations to be installed?
4. provided a copy of this document to the electrician?
Answers to these and other wiring questions are found in the following sections.