CHAPTER 4: INSTALLATION
19
3. Transfer the UPS to the cart.
Two people are required to lift,
move, or install the UPS due to
its weight.
• Slide the UPS onto the cart.
• Once the UPS is on the cart, pull the
cart away from the pallet.
• Remove the metal brackets from the
cart and pallet.
4. Move the UPS on its cart to the front of the
equipment rack where it will be installed.
Installing in a Four Post Rack
1. Install the clip nuts in the rack as shown.
Bottom U-Space