APC 412 kVA Battery Charger User Manual


 
CHAPTER 3: SITE PREPARATION
15
Installation Requirements
When selecting a location for the UPS, consider the following:
Physical Requirements
Standard Installation (4-post rack)
Standard 19 in. (46.5 cm) rack
At least 800 mm deep
15U rack space
Recommended installation is in the bottom of the rack,
due to its weight of up to 600 lbs (273 kg), depending
on the configuration.
Mounting rails and hardware provided
Functional Access
Front access for circuit breakers, maintenance bypass,
PowerView, and module installation or replacement.
Rear access for system enable switch, power distribution
and management communications.
Air Flow
Front to rear airflow.
Do not block front bezels and vents on
rear or sides of the UPS.
Environmental Requirements
Install the UPS in a temperature controlled, clean, dry and protected indoor area that is free of
conductive contaminants.
Temperature 0 – 40 degrees Celsius (32 – 104 degrees F)
Relative Humidity 0 – 95% non-condensing
Elevation 0 – 3,000 m (0 – 10,000 ft above mean sea level)
Thermal Dissipation
UPS 12 kVA N+ 1(Full load) 4246 BTUs typical – Batteries charged
9664 BTUs typical – Batteries charging