Cisco Systems CRS-1 Router User Manual


 
A-2
Cisco CRS-1 Carrier Routing System 8-Slot Line Card Chassis Site Planning Guide
OL-5802-06
Appendix A Site Planning Guidelines
Preliminary Site Survey
Preliminary Site Survey
Typically, you should complete a preliminary site survey before you plan a detailed site survey. This
preliminary survey ensures that the basic system requirements have been completed or are underway
before detailed plans for the site are completed.
Table A-2 is a sample preliminary site survey.
Table A-2 Sample Routing System Preliminary Site Survey
Preliminary Site Survey
Order Information
Sales order number:
Estimated shipping date:
Site ready date:
Installation date:
Site Location and Address
Company name:
Site address:
Shipping address:
Building or computer room access:
Special instructions:
Hours and days of operation:
Site Survey Contacts
Primary Contact
Name and title:
Phone number:
Mobile phone number:
Fax number:
Pager number:
E-mail address: