Cisco CRS-1 Carrier Routing System 8-Slot Line Card Chassis Site Planning Guide
OL-5802-06
Appendix A Site Planning Guidelines
Preliminary Site Survey
Secondary Contact
Name and title:
Phone number:
Mobile phone number:
Fax number:
Pager number:
E-mail address:
Delivery and Installation Constraints
Is there a loading dock available to unload
the equipment at this site?
Is someone on site during working hours
to accept delivery of the materials? If not,
list the times this person is available.
Are there any special requirements for
equipment delivery (for example, special
delivery times, the need for escorts or
IDs, or safety procedures to follow, such
as hard hats, safety glasses, and so on)?
Is the path to the installation area clear? If
not, can arrangements be made to move
the equipment to the installation area?
Describe them.
What floor is the installation site on?
If it is on a floor other than the ground
floor, is there a freight elevator available?
Note whether the equipment needs to be
brought up a flight of stairs.
Equipment Rack Mounting
How many chassis are being installed?
Are there equipment racks currently
available for all chassis to be installed?
Do the equipment racks meet the
installation requirements?
Make a sketch of the area where the
chassis will be installed. Determine how
many chassis (1 or 2) will be installed in
each equipment rack.
Table A-2 Sample Routing System Preliminary Site Survey (continued)
Preliminary Site Survey