Emerson Process Management HYDROS 100 Welding Consumables User Manual


 
CALIBRATION
9 - 9
ETC00781(4) Series 100 e 02/2004
9.2.2 Combined Zeroing and Spanning
With this function a span calibration will be performed after completion of zeroing.
Press the key
until the message appears
Press the key
Enter the correct user code, if not already entered
The displays will now show
You can enter a time interval (hours), when a automatic zeroing and after that a spanning has to
be performed.
Point of reference is the current time.
Range of accepted entries: 0 - 999 (hours)
Note !
If the entry is “0” (zero), the time - controlled calibration is switched off.
Entry is performed using
followed by
After entry of interval, calibration will be done automatically at the end of the entered time interval.
AUTOMATIC ZEROING AND SPANNING (OPTION)