Emerson Process Management HYDROS 100 Welding Consumables User Manual


 
HOUSING
23 - 2
ETC00781(4) Series 100 e 02/2004
OPENING THE HOUSING (1/4 19" HOUSING)
23.2 Opening the Housing
The housing must be opened for checking the electrical connections and for replacement or
cleaning of any of theinternal components of the analyzer.
Be sure to observe chapter VIII. of the safety measures !
23.2.1 1/4 19" Housing
P Disconnect all voltage supplies.
P Table-top analyzers only
* Remove the rubber feet.
* Unscrew the screws shown in Fig. 1-1, Item 8.
* Remove the front mounting frame and carrying strap to rear.
P Unscrew the screws shown in Fig. 1-1, Item 7 and Figs. 1-5 and 1-6, Item 6.
P Remove the analyzer housing top cover panel.
Closing the housing is performed in reverse order.