Grizzly G0763 Planer User Manual


 
Model G0763 (Mfg. Since 8/13)
-17-
Lifting & Placing
HEAVY LIFT!
Straining or crushing injury
may occur from improperly
lifting machine or some of
its parts. To reduce this risk,
get help from other people
and use a fork lift (or other
lifting equipment) rated for
weight of this machine.
Lifting and placing the G0763 will require help
from at least one other person, a fork lift with
four safety hooks and chains (rated for 2500 lbs.
each), and a precision level.
To lift and place the machine:
1. Remove top crate from shipping pallet.
2. Remove loosely packed items from shipping
pallet.
3. Move pallet and machine to selected posi-
tion.
4. Disconnect coolant power cable from electri-
cal cabinet (see Figure 11) by twisting the
knurled ring counterclockwise (the ring clos-
est to the electrical cabinet).
5. Disconnect coolant hose from stand pipe
shown in Figure 12.
6. Set coolant tank assembly aside.
7. Attach a handle to Y-axis handwheel, then
move saddle as close to column as possible.
8. Unbolt machine from shipping pallet.
9. Secure a safety hook and chain to each of
four lifting studs (see Figure 13 for identifica-
tion).
Note: Place padding between chains and
machine to prevent scratching machine.
Figure 11. Location of coolant pump electrical
connection to electrical cabinet.
Coolant Pump
Electrical Connection
Figure 12. Coolant hose connection to stand
pipe.
Coolant Hose
Connection
Stand
Pipe
Figure 13. Lifting studs (2 of 4 shown).
Lifting Studs
(2 of 4)