Lincoln Electric SVM144-B Welder User Manual


 
Service and repair should be performed by only Lincoln Electric factory trained
personnel. Unauthorized repairs performed on this equipment may result in danger
to the technician or machine operator and will invalidate your factory warranty. For
your safety and to avoid electrical shock, please observe all safety notes and pre-
cautions detailed throughout this manual.
If for any reason you do not understand the test procedures or are unable to per-
form the test / repairs safely, contact the Lincoln Electric Service Department for
electrical troubleshooting assistance before you proceed. Call 1-888-935-3877.
POWER MIG 255
F-11 F-11
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC
WARNING
TROUBLESHOOTING & REPAIR
MAIN TRANSFORMER TEST
TEST DESCRIPTION
This procedure will determine if the correct voltages are being:
a. Applied to the primary windings of the main transformer.
b. Induced on the secondary and auxiliary windings of the main transformer.
MATERIALS NEEDED
Volt/Ohm Meter
3/8 in. Nutdriver
5/16 in. Nutdriver