0116 7201 -48 of 90 - 06/00
Rev. 00 © 2000 Hans Pausch Röntgengerätebau Graf-Zeppelin-Str. 1 D-91056 Erlangen ALL RIGHTS RESERVED Ru
Fig. 33 Fig. 34
2.20 Installing the Mount for the Flush Bowl
Lift up the tabletop (CFC panel) (Fig. 34/Pos. 1), it will be held in place by the gas spring.
Remove the two covers on the tube frame. Insert the left and right mounts (Fig. 33/ Pos.
2+3) into the opening of the tube frame and secure them with 2 screws for each.
2.21 Sealing the Table Frame Cover Panel
Seal the table frame cover panel (Fig. 34/Pos. 2) along the table frame using the Sista F 101
sanitary caulking.