Cisco ASR 903 Router Hardware Installation Guide
OL-25178-04
Chapter 3 Installing the Cisco ASR 903 Router
Installing the Power Supply
Figure 3-16 Installing the DC Power Supply
Step 5
Tighten the captive installation screws of the power supply. The recommended maximum torque is 5.5
in.-lb (.62 N-m).
If you are installing a redundant DC power supply, repeat these steps for the second power source.
Installing the Terminal Block
Perform the following procedure to install the terminal block:
Step 1 Locate the terminal block plug.
Step 2 Use a wire-stripping tool to strip the ends of each of the two wires coming from the DC-input power
source to 0.27 inch (6.6 mm) ± 0.02 inch (0.5 mm) and the wire for grounding. Do not strip more than
0.29 inch (7.4 mm) of insulation from the wire. Stripping more than the recommended amount of wire
can leave behind exposed wire from the terminal block plug after installation.
Step 3 Identify the ground, positive, and negative feed positions for the terminal block connection. The
recommended wiring sequence is:
a. Ground lead wire (right)
b. Negative (-) lead wire (left)
c. Positive (+) lead wire (middle)
GE-0 GE-1 GE-2 GE-3 GE-4 GE-5 GE-6 GE-7
PWR
STAT
GE-0 GE-1 GE-2 GE-3 GE-4 GE-5 GE-6 GE-7
PWR
STAT
GE-0 GE-1 GE-2 GE-3 GE-4 GE-5 GE-6 GE-7
PWR
STAT
PWR
STAT
L 0 S L 1 S L 2 S L 3 S L 4 S L 5 S L 6 S L 7 S
PWR
STAT
L 0 S L 1 S L 2 S L 3 S L 4 S L 5 S L 6 S L 7 S
PWR
STAT
L 0 S L 1 S L 2 S L 3 S L 4 S L 5 S L 6 S L 7 S
282340
RUDY RSP
MEM TOD BITS MGMT
ENET
1PPS
IN
1PPS
OUT
1OMHZ
OUT
1OMHZ
IN
CONSOLE
SYNC
ACT
PWR
STAT
INPUT
OK
OUTPUT
FAI L
24V—60V 28A
ALARM
FAN TEMP
CRIT MAJ MIN