A-28
INSTALLATION
POWER WAVE® AC/DC 1000
A-28
1 2 3 4 5 6 7 8
O
N
1 2 3 4 5 6 7 8
O
N
1 2 3 4 5 6 7 8
O
N
1 2 3 4 5 6 7 8
O
N
1 2 3 4 5 6 7 8
O
N
1 2 3 4 5 6 7 8
O
N
ETHERNET BOARD DIP SWITCHES (S3, S4):
MASTER
Internal Synchronization Signal
(for systems without K2282-1 System Interface)
“BANK S4”
Master / Slave Config
“BANK S3”
I / O Termination
“BANK S3”
I / O Termination
“BANK S3”
I / O Termination
MASTER
External Synchronization Signal
(for systems with K2282-1 System Interface)
“BANK S4”
Master / Slave Config
SLAVE
“BANK S4”
Master / Slave Config
(DEFAULT)