Lincoln Electric SVM155-A Welder User Manual


 
F-24 F-24
STATIC SCR TEST (Continued)
TROUBLESHOOTING & REPAIR
MULTI-SOURCE
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC
7. Repeat previous step(s) testing SCR 2,
SCR 3, SCR 4, SCR 5, and SCR 6.
To further check the SCRs’ functions use an
SCR tester and proceed to Active SCR Test.
8. When test is completed, reconnect the
positive bridge leads to the shunt.
9. Reconnect any secondary leads removed
from the SCRs.
10. Reconnect Plug J4 into the firing board.
11. Replace the case top, sides and control
panel.
Remove
Red Paint
Anode
Cathode
FIGURE F.9. SCR HEAT SINK TEST POINTS