GE GE752 Drill User Manual


 
Vertical Drilling Motor, Type GE752, GEK–91584D
49
22
VIEW SHOWING METHOD
OF ASSEMBLING CABLES
THRU STAPLES.
(PINION END)
20
19
BEFORE ASSEMBLING
CONNECTIONS, INSULATE
CABLE SUPPORTS AS SHOWN
WITH P19 TAPED WITH P20
(COMM. END)
MAG. FRAME
WALL
STAPLE
6
SECTION F–F
ATTACH BRUSH HOLDER
CABLES AGAINST INSIDE
WALL OF MAG. FRAME.
12
7,10,45
14
15
COIL TERM.
OR
CABLE TERM.
VIEW SHOWING METHOD
OF CONNECTING SHUNT
CABLES.
54
51
27,
51
P27 FOR PRESSURE SWITCH
USAGE ON OPPOSITE SIDE
ONLY, IF NO PRESSURE SWITCH
REQUIRED PLUG HOLE WITH P51
SECTION C–C
SIDE VIEW OF COMM. CHAMBER
SHOWING PLUGS OPPOSITE SIDE
OF CONNECTION BOX.
C
C
CARBON
BRUSH
34
40,
42
33
VIEW SHOWING BRUSH HOLDER ASSEMBLY
NOTE FOR P10 AND P15:
INSTALL P10 AND P45 WITH LARGER
TERMINAL ON EXC. COIL CONNECTION.
NOTE FOR P52 AND P53:
INSTALL P52 AND P53 ON CONNECTION
BOX END OF P10 AND P45.
61,64
60,
63
A2
A1
CONNECTION
BOX
VIEW AT E
GROUND A1 AND A2
CABLES WITH P65
(G3 AND G4)
FIG. 30. COILED FRAME ASSEMBLY (41D732345 CHG. V). E–39095A.
MODELS
SEE TABLE 2, PAGE 20