Emerson HASXEDE-IM-EX Welding Consumables User Manual


 
Emerson Process Management GmbH & Co. OHG 2-3
2
Installation
X-STREAM XEFD
Instruction Manual
HASXEDE-IM-EX
03/2012
Install the analyzer to a stand or a wall by
means of 4 eyebolts, provided at the instru-
ments rear side.
It is recommended to install the analyzer in an
upright (vertical) position; other orientations
may affect the measuring results.
Fig. 2-2: Dimensions
Cable inlets
(enclosure threads; M20 x 1.5)
Flame arrestors with gas ttings
(enclosure threads: M18 x 1.5)
Eyebolt detail
All dimensions in mm
[inches in brackets]
Transport lugs to be removed after installation
EXPLOSION HAZARD
When installing the analyzer
take care to have an area of
min. 40 mm (1.6") surrounding
the flange free of any solid
components not part of the
instrument, to ensure proper
function of the ange!
2.2 Installation - Analyzer