Emerson Process Management GmbH & Co. OHG 2-21
2
Installation
X-STREAM XEFD
Instruction Manual
HASXEDE-IM-EX
03/2012
After all connections are established in the
specied manner, and veried,
• x the cables according to the installation
instruction given in the cable glands/ con-
duits manufacturer documentation.
• All cable entries must be sealed by me-
ans of either Ex d approved cable glands,
conduits or sealing plugs.
2.4 Installation - Electrical
• Install the analyzer´s cover by means of
ALL 20 screws!
Tightening torque:
25 Nm (221 in.lb)
EXPLOSION HAZARD WHEN OPEN
Do NOT operate the instrument with doors or covers open! This is permitted
only when no hazardous atmosphere is present! Depending on the local
regulation, this may require a competent hot work supervisor to issue a
hot work permit.
Use ALL 20 screws to x the cover!
Violation may cause an explosion hazard!
ELECTRICAL SHOCK HAZARD
Before completing the electrical connection of the instrument, verify cables
are inserted and connected in correct manner!
Ensure the earthing conductor (protective earth; PE) is connected!