Pre-Operation T
asks
Initial Syste
m Setup
1. Change optional setup selections to
desired parameters, as described in
Setup Mode Screens, page 66.
2. Set recipe and flush information as
described in Recipe Screen, page 72 and
Flush Screen, page 73.
Flush Before Using Equipment
The pump flui
d section was tested with lightweight
oil, which
is left in the fluid passages to protect parts.
To avoid co
ntaminating your fluid with oil, flush the
equipment
with a compatible solvent before using
the equipm
ent.
Valve Setting
s
Dose valves and purge valves are factory set with the
hex nut (E) 1-1/4 turns out from fully closed.
Figure 9 Va
lve Adjustment
18 332564B