Graco 332564B Paint Sprayer User Manual


 
Operation Using
Automatic Display Module (ADM)
Operation Usi
ng Automatic Display Module (ADM)
Prime and Fill
the System
NOTE: See Run Mode Screens, page 58, for further
screen information, if needed.
NOTE: You mus
t prime the input lines to the pumps
or the input
s to the color change valves before
priming the
pump and filling the entire system.
1. If using an electrostatic gun, shut off the
electrostatics before filling the lines.
2. Adjust the main air pressure. To ensure proper
operation, set the main air pressure as close to
100 psi (0.7 MPa, 7.0 bar) as possible. Do not
uselessthan85psi(0.6MPa,6.0bar).
3. If this is the first time starting up the system, or if
lines may contain air, purge as instructed under
. Flush the System, page 23 The equipment
was tested with lightweight oil, which should be
flushed out to avoid contaminating your material.
4. If the system is powered down, press
on the
ADM. Make sure that the system is in Standby
mode.
5. Verify that the recipes and the flush sequences
are programmed correctly by checking
the Recipe Screen, page 72 and the
Flush Screen, page 73.
6. Enable the manual override on System Screen 5.
7. Go to the Fill Screen, page 63.
8. Select the desired color to load. Press the Prime
Pump key
. The color will load the pump
through the color stack and out the outlet stack
dump valve.
NOTE: In a single color system, skip step 7 and
prime the pump out to the gun.
9. Press the Fill Line key
to run color out to
the remote mix manifold. The pump will run until
you press the Stop key
to stop the pump.
10. Trigger the gun into a grounded reservoir or
purge receptacle until the line is full, then press
the Stop key
.
11. Repeat for all material lines.
20 332564B