Installation
Installing the iSR6250 Router
3-2 SN0051103-00 A
S
Power Requirements
Power requirements for the iSR6250 router are 0.5 Amp at 100 VAC or 0.25 A at
240 VAC.
Environmental Conditions
Consider the factors that affect the climate in your facility, such as equipment heat
dissipation and ventilation. The router requires the following operating conditions:
Operating temperature range: 5–40°C (41–104°F).
Relative humidity: 15–80 percent, non-condensing.
Installing the iSR6250 Router
Unpack the router, accessories, and documentation. The iSR6250 router is
shipped with the following components, shown in Figure 3-1.
iSR6250 router chassis with two blades installed
DB9 to RJ45 cable adapter
Power cable (6 foot black)
Rail Mounting Kit, part number 50990-00
WEEE Conformance Card
Readme Notice Card
China Optics and Cable SKUs Toxic Substance Table
To install the iSR6250 router:
1. Complete the pre-installation checklist (see page 3-3).
2. Mount the router (see page 3-5).
3. Install the transceivers (see page 3-7).
4. Connect the router to AC power (see page 3-8).
Internet browser One of the following:
Microsoft Internet Explorer 5.0 and later
Netscape Navigator
®
4.72 and later
Mozilla
®
Firefox 1.02 and later
Java 2 runtime environment to support the web applet
Table 3-1. Management Workstation Requirements (Continued)
Item Description