Cisco Systems 2130 Welding System User Manual


 
2-15
Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide
78-18579-02
Chapter 2 Preparing to Install the Cisco ADE 2130 and 2140 Series Appliance
Preparing Your Site for Installation
Rack-Mount Kit (For kit contents, see the “2-Post Rack-Mount Hardware Kit” section on page 3-4
or the “4-Post Rack-Mount Hardware Kit” section on page 3-7.)
Cables for connection to the LAN ports (depending on the configuration).
Ethernet hub or PC with a network interface card for connection to the Ethernet (LAN) port or ports.
Console terminal (an ASCII terminal or a PC running terminal-emulation software) that is
configured for 9600 baud, 8 data bits, no parity, 1 stop bit, and no hardware flow control.
Console cable for connection to the serial (console) port.
Installation Checklist
To assist you with your installation and to provide a historical record of what was done, and by whom,
use the following Installation Checklist. Make a copy of this checklist and mark the entries as you
complete each task. When the checklist is completed, include a copy of the checklist for each
Cisco ADE 2130 and 2140 Series appliance in your Site Log (see the “Creating a Site Log” section on
page 2-15 for information about creating a Site Log) along with other records for your new appliance.
Creating a Site Log
The Site Log (see Appendix B, “Site Log,” for a sample Site Log) provides a record of all actions related
to installing and maintaining the Cisco ADE 2130 and 2140 Series appliance. Keep the log in an
accessible place near the appliance so that anyone who performs tasks has access to it. Use the
Installation Checklist (see the previous section, “Installation Checklist”) to verify the steps in the
installation and maintenance of your appliance. Site Log entries might include the following:
Installation Checklist for Site:
Cisco Application Deployment Engine 2130 or 2140 Series Appliance Name:
Task Verified by Date
Installation Checklist copied
Background information placed in Site Log
Site power voltages verified
Installation site power check completed
Required tools available
Additional equipment available
ADE 2130 or 2140 Series appliance received
Cisco Information Packet publication received
Appliance components verified
Initial electrical connections established
ASCII terminal (for local configuration)
Signal distance limits verified
Startup sequence steps completed
Initial operation verified