Cisco Systems 2130 Welding System User Manual


 
4-4
Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide
78-18579-02
Chapter 4 Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options
Beginning the Installation
Step 2 Power down the appliance and all external devices. Disconnect the AC power cord or DC power source
and all external cables.
Step 3 Attach the antistatic wrist strap to your wrist and connect its cord to the ESD socket on the top, left-hand
side on the front of the appliance.
Step 4 Remove the shipping screw, if present.
Step 5 While pushing in and holding the blue button at the top of the appliance chassis (see location 1 in
Figure 4-1), slide the top cover back until it stops.
Figure 4-1 Removing the Cisco ADE 2130 and 2140 Series Appliance Cover
Step 6
Lift the cover straight up to remove it from the appliance.
Caution For proper cooling and airflow, replace the cover before turning on the appliance. Operating the
appliance for extended periods (over 30 minutes) with the cover removed might damage the appliance
components.
Warning
The covers are an integral part of the safety design of the product. Do not operate the unit without the
covers installed.
Statement 1077
1 Blue button
A
1
231198