Lincoln Electric 200 Welder User Manual


 
MAIN GENERATOR FRAME REMOVAL AND REPLACEMENT PROCEDURE
WARNING
TROUBLESHOOTING & REPAIR
F-49 F-49
PIPELINER® 200
Service and repair should be performed by only Lincoln Electric factory trained personnel.
Unauthorized repairs performed on this equipment may result in danger to the technician
or machine operator and will invalidate your factory warranty. For your safety and to avoid
electrical shock, please observe all safety notes and precautions detailed throughout this
manual.
If for any reason you do not understand the test procedures or are unable to perform the
test/repairs safely, contact the Lincoln Electric Service Department for electrical trou-
bleshooting assistance before you proceed. Call 1-888-935-3877.
DESCRIPTION
This procedure will aid the technician in the removal and replacement of the main DC
generator frame.
MATERIALS NEEDED
Rope sling
Wood or steel blocks
Pry bars
9/16” Wrench
1/2” Wrench
7/16” Wrench
3/4” Wrench
Slot head screw driver
Wiring Diagram
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC