Q-Logic ISR6200 Router User Manual


 
4–Configuration
Zoning Virtual Port Groups on the SAN
ISR651101-00 G 4-11
When connecting a dual-blade iSR6200 for high availability, connect one Fibre
Channel port from each blade to each of your fabrics (see Figure 4-7). This
topology provides link-level, switch-level, and blade-level failure protection. To
make this effective, you must connect the iSCSI hosts to both iSR6200 blades.
For details, see “Connecting iSCSI Hosts to the iSR6200” on page 4-16.
Figure 4-7. High-Availability, Dual Blades, Dual Fibre Channel Switches
SAN A
iSR6200
FC Target Array
SAN B
Blade 1
Blade 2
21:00:00:c0:dd:13:16:f8
21:01:00:c0:dd:13:16:f8
21:02:00:c0:dd:13:16:f8
FC1
FC2
FC1
FC2
21:00:00:c0:dd:13:16:f9
21:01:00:c0:dd:13:16:f9
21:02:00:c0:dd:13:16:f9
21:00:00:c0:dd:13:17:02
21:01:00:c0:dd:13:17:02
21:02:00:c0:dd:13:17:02
21:00:00:c0:dd:13:17:03
21:01:00:c0:dd:13:17:03
21:02:00:c0:dd:13:17:03
FC1 A0
A1
B0
B1
Controller A
Controller B
FC2
FC1
FC2
A0
B1
21:00:00:c0:dd:13:16:f8
21:01:00:c0:dd:13:16:f8
21:02:00:c0:dd:13:16:f8
A0
B1
21:00:00:c0:dd:13:17:02
21:01:00:c0:dd:13:17:02
21:02:00:c0:dd:13:17:02
A1
B0
A1
B0
Zone 6200 Blade 1 A Zone 6200 Blade 2 A
Zone 6200 Blade 1 B Zone 6200 Blade 2 B
21:00:00:c0:dd:13:16:f9
21:01:00:c0:dd:13:16:f9
21:02:00:c0:dd:13:16:f9
21:00:00:c0:dd:13:17:03
21:01:00:c0:dd:13:17:03
21:02:00:c0:dd:13:17:03