Lincoln Electric DC-655 Soldering Gun User Manual


 
CONNECTING THE LN-8 OR LN-9 TO THE
IDEALARC DC-655 (TERMINAL STRIP)
1. Set the Idealarc DC-655 POWER toggle switch to
the OFF (0) position.
2. Disconnect main AC input power to the Idealarc
DC-655.
3. Connect the wire feeder control cable leads to the
Idealarc DC-655 terminal strip as shown in Figure
C.4.
4. Connect the wire feeder control cable ground lead
to the frame terminal marked .
5. Extend wire feeder control cable lead #21 so it can
be connected directly to the work piece.
a. Make a bolted connection using AWG #14 or
larger insulated wire. Tape the bolted connec-
tion with insulating tape.
b. An S-16586- X remote voltage sensing work
lead is available for this purpose.
c. Keep the #21 lead electrically separate from
the work cable circuit and connection.
d. Tape the #21 lead to work cable for ease of
use.
6. Connect LN-9 wire feeder control jumpers on
Voltage Control board. See LN-9 Operator’s
Manual.
NOTE: The connection diagram shown in Figure C.4
shows the electrode connected for positive
polarity. To change polarity:
a. Set the Idealarc DC-655 POWER toggle
switch to the OFF (0) position.
b. Move the electrode cable to the negative (-)
output terminal (High inductance or low
inductance as needed).
c. Move the work cable to the positive (+) output
terminal.
d. Connect control cable lead #21 to “+21” on
the terminal strip.
7. Set the OUTPUT CONTROL switch to the
“Remote” position and the OUTPUT TERMINALS
switch to the “Remote” position.
ACCESSORIES
C-8 C-8
IDEALARC DC-655
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC
FIGURE C.4 - LN-8 OR LN-9 WIRE FEEDER CONNECTION TO THE IDEALARC DC-655
NEGATIVE
POSITIVE
32
31
2
4
GND
21
ELECTRODE CABLE
TO WIRE FEED UNIT
TO WORK
}
POWER SOURCE
N.E.
CABLE
21
A
B
C
}
TO LN-8 OR LN-9
CONTROL
INPUT CABLE PLUG
41
4231
32
75 76
77
21
-
21
+
REMOTE VOLTAGE SENSING LEAD