Emerson Process Management 3-9008-701 Saw User Manual


 
Operating and maintenance instructions Section 2: Installation and set-up
3-9008-701 Rev J January 2015
Set-up 15
Figure 2-1 Typical prover installation
2.2 Set-up
2.2.1 Supplying electrical power to the compact prover
Reference Table 1-3 for standard voltage and amperage information. Optional voltage and
amperage information not listed in Table 1-3 is provided with the documentation package
(electrical schematic) shipped with every prover. If this information is not included with the
shipment, contact a local Daniel representative for assistance.
Standard provers are shipped with a multi-conductor power cable for connection to a power
supply. If an electrical conduit connection is desired, remove the existing power cable. Access to