IBM 9077 Router User Manual


 
Installation and Configuration 84
Figure 33. Node Numbering for an SP System
3.5.2 Procedure to Get the Jack Number
Following are the steps required to get the jack number:
1. From the SP control workstation, determine the dependent node’s number
by entering
SDRGetObjects DependentNode node_number. This produces
output that looks like the following:
2. From the SP CWS, determine the switch_node_number by entering
SDRGetObjects DependentNode node_number==n switch_node_number, where n
is the node_number of the dependent node you just got from the previous
command. This gives the following output:
3. From the SP CWS, determine the host name of the SP Switch primary
node by entering
splstdata -s | grep -p primary. The output looks like
this:
Switch 3
Frame 4
49
53
57
61
Switch 1
Frame 1
2
10
14
4
8
12
16
1
5
9
13
3
7
11
15
6
Switch 2
Frame 2
17
21
25
29
19
23
27
31
Frame 3
33
37
41
45
35
39
43
47
# SDRGetObjects DependentNode node_number
node_number
4
#
# SDRGetObjects DependentNode node_number==4 switch_node_number
switch_node_number
3
#