Emerson HASAxE-IM-HS Welding Consumables User Manual


 
X-STREAM
Emerson Process Management GmbH & Co. OHG7-24
Instruction Manual
HASAxE-IM-HS
05/2006
To start any calibration select one of the two
upper lines to perform the related calibration.
Select the ZERO CALIBRATION.. line.
Dual channel instrument:
Optional gas component selection menu -
Select the component to be calibrated.
Starting from the measurement screen press
the DOWN key to open the MAIN MENU and
enter the CONTROL menu.
CANCEL calibration!
START calibration!
ZeroGas 0.000 ppm
CO2.1 0.200 ppm
The first line gives you the choice to cancel the
procedure now (means without having started
it at all).
Select the second line to start the calibration.
Line 3 shows the calibration gas setup (here:
required zero gas concentration is 0.000 ppm),
while line 4 shows the currently measured gas
concentration.
7-3-4-2 Zero Auto Calibration
7-3-4 Auto Calibration
Before selecting any further line
make sure the required calibra-
tion gas is applied!
Supply all calibration gases with
the same flow as the sample gas
(recommeded approx. 1 l/min),
pressureless and utilizing the
right gas fitting (see sect. 3-4).
Make sure the calibration purge
time is set to a value ensuring the
measuring cell is filled pro-perly
with the related calibration gas
after the valve has opened!
Ensure the warm-up time after
switching on has elapsed!
Warm-up time is 15 to 50 minutes
depending on installed measu-
ring system and configuration!
Zero calibration..
Span calibration..
Apply gas..
Control..