Lincoln Electric SVM135-B Welder User Manual


 
F-37
TROUBLESHOOTING AND REPAIR
F-37
AUXILIARY TRANSFORMER NO. 2 TEST
Service and repair should only be performed by Lincoln Electric factory trained
personnel. Unauthorized repairs performed on this equipment may result in dan-
ger to the technician or machine operator and will invalidate your factory warran-
ty. For your safety and to avoid electrical shock, please observe all safety notes
and precautions detailed throughout this manual.
If for any reason you do not understand the test procedures or are unable to per-
form the test/repairs safely, contact the Lincoln Electric service department for
technical troubleshooting assistance before you proceed. Call 216-383-2531 or
1-800-833-9353(WELD).
------------------------------------------------------------------------------------------------
TEST DESCRIPTION
This test will determine if the correct voltage is being applied to the primary of Auxiliary
Transformer No. 2 and also if the correct voltage is being induced on the secondary
winding of the transformer.
This procedure takes approximately 10 minutes to perform.
MATERIALS NEEDED
Volt-Ohmmeter (Multimeter)
3/8 in. nutdriver
Wiring diagram
POWER WAVE 455/POWER FEED 10
WARNING