3-59
Cisco 12000/10700 v3.1.1 Router Manager User Guide
OL-4455-01
Chapter 3 Getting Started
Deployment
Performing Pre-deployment
Say that you are expecting the following hardware:
• Cisco 12016 chassis and GRP(s)
• ATM and POS line cards (with respective interfaces)
To perform both manual pre-deployment and offline configuration, proceed as follows:
Step 1 Manually deploy a site object. See “Manually Deploying a Generic Site Object” section on page 3-10
for further details.
Step 2 Manually deploy the Cisco 12000 Series Router chassis under a site. See “Manually Deploying a Cisco
12000/10720 Chassis” section on page 3-20 for further details.
Step 3 Manually deploy GRP(s). See “Manually Deploying a GRP Card” section on page 3-31 for further
details.
Step 4 Manually deploy the ATM line cards. ATM interfaces are deployed simultaneously. See “Manually
Deploying Line Cards” section on page 3-38 for further details.
Step 5 Manually deploy the POS line cards. POS interfaces are deployed simultaneously. See “Manually
Deploying Line Cards” section on page 3-38 for further details.
Now you have pre-deployed and thus created representative objects in Cisco 12000/10720 Router
Manager for your expected hardware, modules, and interfaces. All of these objects will be in the
Decommissioned state.