Chapter 5 Installing and Removing Exterior Components
Installing or Removing the Front Side Exterior Components
Steps
To install the front cover, perform the following steps:
Step 1 Remove the new front cover from its packaging, then set the packaging aside.
Step 2 Attach the ESD-preventive wrist strap to your wrist and connect its leash to one of the ESD connection
sockets on the front (PLIM) side of the chassis or a bare metal surface on the chassis.
Step 3 Install the ball stud retainer brackets on the vertical chassis rack rails, two on the left and two on the
right, as shown in Figure 5-6.
Figure 5-6 Location of Ball Stud Retainer Brackets on Vertical Chassis Rack Rails
Step 4
Using the screwdriver, tighten the four flat head screws that attach each ball stud retainer bracket to the
vertical chassis rack rails, as shown in Figure 5-7.
1 Ball stud retainer brackets
279896