Schneider Electric 372 SPU 780 01EMAN Welding System User Manual


 
Working with Controllers
90
372 SPU 780 01EMAN May 2002
Initializing Logic in a Controller
Overview Initializing logic erases the networks, register contents and ASCII messages in a
programmable controller. The controller must be stopped before you can initialize
logic.
It is strongly recommended that you read the contents of the controller to a backup
database before initializing logic.
Initializing Logic From the project right click menu:
WARNING
Ensure data integrity is maintained.
You are about to erase the contents of your controller. If you want to
save any information stored in the controller, ensure that its contents
have been read to a database.
Failure to follow this precaution can result in severe injury or
equipment damage.
Step Action
1 Select Online Commands
Init Logic.