Barco R9850042 Tool Storage User Manual


 
6. Stack Manager
6.2 Restrictions on stacking
Overview
Stack manager works only for LED displays.
Each screen must contain the same type of tiles.
6.3 Before using the Stack manager
Steps to be taken for a new configuration
1. Go to Autodetect and click on .
The software scans the configuration for the available hardware and reads out the settings. When
a stack configuration is detected, a new window will be added in the ’overview’ frame. All detected
screens will be added in a default display. (image 6-3)
2. Click on
.
3. Select Screen 1 by clicking on the pop down next to screen.
The configuration icons for screen 1 will be displayed in the ’overview’ frame.
4. Fill out the grid dimensions, tile linkage and tile resolution for the selected screen.
Caution: Execute this step very carefully as the Stack Manager needs the entered values for future
calculations.
For more explanation, consult chapter wall positioning.
Grid dimensions see "Grid Dimensions", page 33
Tile linkage
see "Define the Tile Linkage", page 34
Wall positioning (start, tile
resolution)
see "Wall Positioning for DLite, SLite, OLite and ILite walls", page
34
5. If there are still screens which must be configured, repeat procedure from step 3 for the next not con-
figured screen. Otherwise the configuration is ready to start up the Stack Manager.
Image 6-3
Stack configuration icon
6.4 Stack overview
Content of the Stack overview
The stack overv
iew groups the different displays and screens in a stack. From this overview it is possible
to manage the different displays and the different screens in a display so that a complete installation can
be configured.
Display selection
By clicking on the first drop down list, the available displays will be shown. Select the display you have to
configure.
76
R5976380 XLITE TOOLSET 16/03/2005