Performance Verification
E-10 GB1400 Acceptance Test
Confirmation of Buttons and Indicators
q Step 49: Reset both the Generator and Analyzer by cycling the power.
q Step 50: Verify the following Generator LEDs.
Section ON OFF
CLOCK FREQUENCY RECALL
SAVE
EXT
PATTERN PRBS WORD
RECALL
SAVE
WORD LENGTH
F1 - F4
Bits 1 - 8
OUTPUT DATA CLOCK
INVERT DATA
ERROR INJECT RATE
Left Side PANEL LOCK
GPIB ADDR
LOCAL
q Step 51: Verify the Generator LEDs and buttons operate by toggling the following
buttons and observing the LEDs turn ON and OFF.
Section LED/Button Indicator
Left Side PANEL LOCK
GPIB ADDR
ON - OFF
ON - OFF