Mitsubishi Electronics 60/60S Router User Manual


 
6. Data In/Out
6.4 PROGRAM COPY
I-261
(Note 1) When using the 2-part system, the machining program merge operation can be switched with the
parameters.
#1050
MemPrg
#1285
ext21/bit0
Details
0, 2, 4, 6 - Of the machining programs registered in the memory common for the
systems, the machining programs with the designated program numbers
are merged together.
1, 3, 5, 7 OFF Of the machining programs registered in the memory for the selected
system, the machining programs with the designated program numbers
are merged together.
ON Of all the machining programs registered in the memory for each system,
the machining programs with the designated machining program numbers
are merged together in each system.
(Note 2) When using the 2-part system and the same number batch generation for all system programs is
valid, an error (E14) will occur if the merge source program for all systems is not found.
(Note 3) When using the 2-part system and the same number batch generation for all system programs is
valid, the program will be merged in the following manner according to the presence of the merge
destination program in each system.
Presence of program
System 1 System 2
Operation
Yes Yes
The System 1 merge source program will be merged with the System 1
merge destination program.
The System 2 merge source program will be merged with the System 2
merge destination program.
Yes No
The System 1 merge source program will be merged with the System 1
merge destination program.
The System 2 merge destination program will be newly created, and then
the System 2 merge source program will be merged with the System 2
merge destination program.
No Yes
The System 1 merge destination program will be newly created, and then
the System 1 merge source program will be merged with the System 1
merge destination program.
The System 2 merge source program will be merged to the System 2
merge destination program.
No No An error (E14) occurs.
(Note 4) When using the 2-part system and the same number batch generation for all system programs is
valid, the programs in the systems having the merge source program are merged. The programs
in systems that do not have the merge source program will not be merged.